Sr No | PROJECT | ACTIVITIES | CLIENT | STATUS |
---|---|---|---|---|
1 | Master planning of Greenwood Housing Society, Jhang, Punjab | GWHS | Completed (2019) | |
2 | Master planning of army welfare housing society Phase-II, Rawalpindi | ATL | Completed (2019) | |
3 | Hydropower Study, Hydro-Dynamic Modeling, Inondation Mapping and design of soon River (kaak pul- Bahria Bridge) |
CBR Town, Rawalpindi | Completed (2018) | |
4 | Petrographic Study of river suspended sediments Neelum River, AJSK |
Pakistan Engineering Services (PES), Lahore |
Completed (2018) | |
5 | Geological, Geo-technicians, Construction Material Study Of Garuk Storage, Dam Baluchestan |
Balochistan Irrigation | Completed (2018) | |
6 | Geological Mapping & Geo-Technical investigations for Daral Khwar HPP Bahrain, swat. |
SadiqSons Hydro | Completed (2018) | |
7 | 35 MW K-III Hydropower Project, District Kohistan, KPK | Pre-Feasibility Study Feasibility Study |
ATL (Pvt.) Ltd | Completed (2018) |
8 | 79 MW K-II Hydropower Project, District Kohistan, KPK | Pre-Feasibility Study Feasibility Study |
ATL (Pvt.) Ltd | Completed (2018) |
9 | Chorit Irrigation scheme, District Astore, Gilgit Baltistan | Engineering Design Engineering Estimate Topographic Survey |
IFAD | Completed (2017) |
10 | Kakan Irrigation scheme, District Astore, Gilgit Baltistan |
Engineering Design Engineering Estimate Topographic Survey |
IFAD | Completed (2017) |
11 | Minimurg-I Irrigation scheme, District Astore, Gilgit Baltistan |
Engineering Design Engineering Estimate Topographic Survey |
IFAD | Completed (2017) |
12 | Pashwari Irrigation scheme, District Astore, Gilgit Baltistan |
Engineering Design Engineering Estimate Topographic Survey |
IFAD | Completed (2017) |
13 | Thing Bala Irrigation scheme, District Astore, Gilgit Baltistan |
Engineering Design Engineering Estimate Topographic Survey |
IFAD | Completed (2017) |