ENGINEERING SERVICES

[asvc_table]

Sr No PROJECT ACTIVITIES CLIENT STATUS
1 Master planning of Greenwood Housing Society, Jhang, Punjab GWHS Completed (2019)
2 Master planning of army welfare housing society Phase-II, Rawalpindi ATL Completed (2019)
3 Hydropower Study, Hydro-Dynamic Modeling,
Inondation Mapping and design of soon River
(kaak pul- Bahria Bridge)
CBR Town, Rawalpindi Completed (2018)
4 Petrographic Study of river suspended sediments
Neelum River, AJSK
Pakistan Engineering
Services (PES), Lahore
Completed (2018)
5 Geological, Geo-technicians, Construction
Material Study Of Garuk Storage,
Dam Baluchestan
Balochistan Irrigation Completed (2018)
6 Geological Mapping & Geo-Technical
investigations for Daral Khwar HPP Bahrain, swat.
SadiqSons Hydro Completed (2018)
7 35 MW K-III Hydropower Project, District Kohistan, KPK Pre-Feasibility Study
Feasibility Study
ATL (Pvt.) Ltd Completed (2018)
8 79 MW K-II Hydropower Project, District Kohistan, KPK Pre-Feasibility Study
Feasibility Study
ATL (Pvt.) Ltd Completed (2018)
9 Chorit Irrigation scheme, District Astore, Gilgit Baltistan Engineering Design
Engineering Estimate
Topographic Survey
IFAD Completed (2017)
10 Kakan Irrigation scheme, District Astore,
Gilgit Baltistan
Engineering Design
Engineering Estimate
Topographic Survey
IFAD Completed (2017)
11 Minimurg-I Irrigation scheme, District
Astore, Gilgit Baltistan
Engineering Design
Engineering Estimate
Topographic Survey
IFAD Completed (2017)
12 Pashwari Irrigation scheme, District
Astore, Gilgit Baltistan
Engineering Design
Engineering Estimate
Topographic Survey
IFAD Completed (2017)
13 Thing Bala Irrigation scheme, District
Astore, Gilgit Baltistan
Engineering Design
Engineering Estimate
Topographic Survey
IFAD Completed (2017)

[/asvc_table]